Project Radar Logo
Project Radar
  • Profile Picture
    Anonymous

Project Example #1

Metrics
Team Rework Summary Team Rework Trend
Analytics
Release Time/Rework Count Association


The latest value for Team Rework is 71.4 %.

Rework measures the percentage of rework of stories performed by the team.

Tasks should move forward - if there are tasks that move backward then this indicates a problem : either unclear acceptance/completion criteria; or that work is being rushed.

Bubbles in rework close to release indicates rushes which can lead to lower quality.



Team Rework is high but trending down

Rework measures the percentage of rework of stories performed by the team.

Tasks should move forward - if there are tasks that move backward then this indicates a problem : either unclear acceptance/completion criteria; or that work is being rushed.

Bubbles in rework close to release indicates rushes which can lead to lower quality.



There is a no association between Release Time and Rework Count.

Release Time/Rework Count Association measures the correlation between the cadence of releases and the amount of rework required. A positive correlation indicates that rework impacts on the cadence of releases; a negative or no correlation indicates that rework does not impact on release cadence.

  • Project Example #1
  • Dashboard
  • Metrics Explorer
  • Analytics
  • Product
    • Product Quality
    • Product Scope
    • Product Size
    • Product Value
  • Team
    • Team Cohesion
    • Team Performance
    • Team Efficiency
    • Team Maturity
    • Team Rework
    • Team Reaction Speed
  • Delivery
    • Delivery Health
    • Team Velocity
    • Delivery Stability
    • Technical Debt
  • More
  • Settings
  • Switch Project
  • Logout
  • © 2017 Technology Matters Limited